LPG Cylinder Trimming and Beading Machine. Depending on the customer request, trimming die and beading die can be separated into two individual machines | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-production-line/lpg-cylinder-trimming-beading-machine/

LPG Cylinder Trimming and Beading Machine. Depending on the customer request, trimming die and beading die can be separated into two individual machines.

Formed LPG Cylinder Halves | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-production-line/lpg-cylinder-body-forming-line/

LPG Cylinder Body Forming Line. To get the shape of the LPG Cylinders, sheet materials are loaded into hydraulic presses, blanked and deep drawn.

Re-validation Air Leakage Test. LPG Cylinder re-validation line includes testing air leakage of LPG Cylinders | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/re-validation-air-leakage-test/

LPG Cylinder Re-validation Air Leakage Test. LPG Cylinder re-validation line includes testing machine for air leakage of LPG Cylinders.

Weighing and Stamping of LPG Cylinder. LPG Cylinders' weight are measured and stamped onto cylinders with automatic weighing and stamping machine | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/weighing-and-stamping/

Weighing and Stamping of LPG Cylinders. LPG Cylinders' weight are measured and stamped onto cylinders with automatic weighing and stamping machine.

Primer Coat Painting | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/primer-coat-painting/

LPG Cylinders are first painted with primer paint in LPG Cylinder Re-Validation Line.

Painting Inspection. In LPG Cylinder Re-validation line, before doing the painting of the cylinders they are inspected for general faults as a precaution | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/painting-inspection/

LPG Cylinder Painting Line utilizes an overhead conveyor system that conveys the cylinders for all steps of painting line.

Re-validation Shot Blasting. LPG Cylinder re-validation line includes shot blasting of LPG Cylinders to get a smoother surface for painting operation | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/re-validation-shot-blasting/

LPG Cylinder Shot Blasting Machine is used to automatically clean the surface of the LPG cylinders by blasting of the grit material coming from the turbines

Re-Validation Hydrostatic Pressure Test. LPG Cylinder re-validation line includes hydrostatic pressure test of cylinders | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/re-validation-hydrostatic-pressure-test/

Re-Validation Hydrostatic Pressure Test. LPG Cylinder re-validation line includes hydrostatic pressure test of cylinders | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/re-validation-hydrostatic-pressure-test/

Re-Validation Heat Treatment Furnace. LPG Cylinder re-validation line includes heat treatment, because new welding operation makes steel stressed to relieve | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/re-validation-heat-treatment-furnace/

Furnace of the LPG Cylinder.

Re-Validation Welding. LPG Cylinder re-validation line consists of welding of the separated parts of cylinders | ROK Teknik Metal Makine ve Kalip San. Tic. Ltd. Sti. | www.rokteknik.com/lpg-cylinder-revalidation-line/re-validation-welding/

LPG Cylinder body generally consists of two half cylinder welded around the center. For LPG Cylinders where the height of the cylinder is much more than.